Structural Steel RFQ & Quotation

Key Elements of a Structural Steel RFQ

A well-prepared structural steel RFQ should clearly define the project requirements, supply scope, technical specifications and commercial expectations. The following considerations can help international buyers communicate more effectively with potential manufacturers and reduce misunderstandings during the quotation process.

RFQ Preparation

Project information, drawings, BOQ and technical requirements.

Supply Scope

Structural members, bolts, coatings and supply boundaries.

Pricing Structures

Unit prices, lump-sum offers and steel weight calculations.

Quotation Comparison

Compare technical scope, quality, pricing and exclusions.

Commercial & Delivery

Incoterms, payment terms, lead times and shipping.

Common RFQ Mistakes

Avoid missing scope, unclear quantities and pricing risks.

1. Preparing a Structural Steel RFQ

A Request for Quotation (RFQ) is the starting point for obtaining a structural steel manufacturing proposal. The more clearly the project information is presented, the easier it is for suppliers to understand the requirements and prepare a reliable quotation.

Essential information to include in an RFQ:

  • Project Information: Project name, country, location, building type and current project stage.
  • Structural Drawings: General arrangement drawings, structural plans, elevations, sections and connection details, if available.
  • Bill of Quantities (BOQ): Estimated steel quantities, member sizes and material grades. Preliminary quantities may be provided if final calculations are not yet complete.
  • Applicable Standards: Relevant material, fabrication, welding and inspection standards, such as ASTM, AISC or EN requirements, as applicable.
  • Surface Treatment: Requirements for painting, hot-dip galvanizing, coating systems or other corrosion protection methods.
  • Delivery Requirements: Expected delivery schedule, destination, proposed Incoterms and packaging requirements.
  • Technical Responsibilities: Clarification of which party is responsible for structural design, connection design and shop drawing preparation.

Important consideration:

Not every project has complete drawings or a finalized BOQ at the initial inquiry stage. Buyers may begin with preliminary information, provided that assumptions, exclusions and outstanding technical details are clearly identified.

A quotation based on preliminary information should be treated as an indicative estimate rather than a final contractual price.

2. Defining the Supply Scope

Defining the supply scope is one of the most important parts of a structural steel RFQ. Two manufacturers may provide significantly different quotations for the same project simply because their understanding of the required materials, components and services is different.

A clear scope of supply helps buyers identify what is included, what is excluded and which responsibilities require further clarification.

Key items to clarify in the supply scope:

  • Primary Steel Structure: Steel columns, beams, rafters, bracing members and other main structural components.
  • Secondary Steel Structure: Purlins, girts, secondary framing, support members and miscellaneous steel components.
  • Connection Components: Connection plates, stiffeners, gusset plates and other fabricated connection materials.
  • Bolts and Fasteners: Structural bolts, nuts, washers and other fastening components. Bolt grades, quantities and relevant standards should be specified.
  • Anchor Bolts and Embedded Items: Anchor rods, base plates, embedded plates and related accessories, where applicable.
  • Roof and Wall Systems: Metal roof sheets, wall cladding, insulation, skylights, flashing and related accessories, if included in the manufacturer’s supply.
  • Additional Steel Components: Steel stairs, platforms, handrails, ladders, grating and other miscellaneous metalwork.
  • Surface Treatment: Surface preparation, painting, hot-dip galvanizing or other protective coating systems.
  • Engineering and Detailing: Connection design, shop drawings, material take-offs and technical documentation, where included in the agreed scope.
  • Quality and Inspection: Material certificates, fabrication inspections, non-destructive testing and third-party inspection requirements.
  • Packing and Delivery: Export packaging, container loading, transport arrangements and applicable delivery terms.
  • Site Installation: Clarification of whether installation, erection supervision or on-site technical assistance is included or excluded.

Why supply scope matters:

A quotation that includes only the primary steel structure cannot be directly compared with another quotation that also includes secondary steel, structural bolts, roof and wall cladding, surface treatment and shipping.

A lower quoted price does not necessarily mean a lower total project cost.

Before comparing supplier quotations, buyers should request a clear scope breakdown and verify whether all required components and services have been considered.

Important consideration:

The RFQ should clearly distinguish between the manufacturer’s supply responsibilities and the responsibilities of the project designer, general contractor, local installation contractor and other project participants.

Items that are not included should be expressly identified as exclusions rather than left undefined.


3. Understanding Structural Steel Pricing Structures

Structural steel quotations can be prepared using different pricing methods depending on the project design stage, available engineering information, manufacturing requirements and commercial arrangements.

Understanding the pricing structure is essential when evaluating quotations from different manufacturers.

Common structural steel pricing methods include:

1. Price per Metric Ton

Many structural steel manufacturers quote their products based on a unit price per metric ton.

For example, a quotation may indicate:

  • Structural steel fabrication: USD per metric ton
  • Hot-dip galvanizing: USD per metric ton
  • Export packaging: USD per metric ton
  • Structural bolts and accessories: Separately quoted or included
  • Ocean freight: Separately calculated according to the delivery destination

However, a price per ton does not automatically mean that different quotations are directly comparable.

Buyers should confirm which materials, manufacturing operations, protective treatments and services are included in the quoted unit price.

2. Fixed Lump-Sum Pricing

Under a fixed lump-sum quotation, the manufacturer offers a total price for an agreed supply scope.

This method may be suitable when approved drawings, material quantities, technical specifications and supply responsibilities are sufficiently defined.

The quotation should clearly identify the documents, drawing revisions and scope assumptions used to establish the price.

Changes to drawings, quantities or technical requirements may require an agreed price adjustment.

3. Preliminary Budget Pricing

During the early project development stage, complete structural drawings or final material quantities may not be available.

In such cases, manufacturers may prepare an indicative budget using preliminary drawings, estimated steel consumption, historical manufacturing data or other stated assumptions.

Budget pricing is useful for early feasibility studies and procurement planning, but it should not be treated as a final manufacturing quotation.

Understanding Steel Weight and Quantity Calculations

One of the most important commercial questions is how the steel quantity will be calculated and settled.

Possible measurement bases include:

  • Theoretical Steel Weight: Weight calculated from agreed drawings, member dimensions and specified material properties or standard mass tables.
  • Fabricated Steel Weight: Weight determined according to an agreed measurement method for completed fabricated components.
  • Actual Weighed Quantity: Weight established using an agreed weighing procedure, with the included items clearly defined.
  • Gross Shipping Weight: Weight used for shipping and logistics purposes, which may include packaging and transport accessories.

These quantities are not necessarily interchangeable.

For example, a project may initially be estimated at 500 metric tons, but the final quantities may change following approved detailing, connection development or design revisions.

Whether such changes affect the final payment depends on the contract’s quantity measurement and settlement provisions.

Questions buyers should clarify:

  • Is the quotation based on estimated quantities or a confirmed BOQ?
  • Is the unit price calculated using theoretical or another agreed weight basis?
  • Are connection plates, stiffeners and other fabricated accessories included in the measured steel weight?
  • Are bolts and fasteners included in the unit price or quoted separately?
  • How will additional quantities or design changes be priced?
  • Will the final settlement use the quoted quantity, approved drawings or another agreed measurement method?
  • Is the quoted unit metric ton equivalent to 1,000 kilograms?

Important consideration:

A low price per ton may not represent the lowest overall cost if the quotation excludes essential components or uses a different quantity settlement method.

Buyers should evaluate both the unit price and the contractual measurement basis before accepting an offer.


4. Comparing Structural Steel Supplier Quotations

Comparing structural steel quotations involves more than reviewing the final quoted amount.

Different manufacturers may adopt different assumptions regarding material grades, fabrication complexity, supply scope, inspection requirements, protective treatments and delivery responsibilities.

A meaningful quotation comparison requires buyers to establish a consistent technical and commercial basis.

Key areas to compare include:

1. Material Specifications

Confirm whether suppliers are quoting the same material grades, dimensions, product standards and documentation requirements.

Material substitutions should not be assumed to be acceptable without appropriate technical evaluation and approval.

2. Fabrication Scope

Verify that the quotations cover the same steel components and manufacturing operations.

Differences in connection fabrication, hole preparation, welding, assembly and finishing can significantly affect manufacturing costs.

3. Surface Treatment

Determine whether the quoted price includes painting, galvanizing, blasting or other surface protection requirements.

Where applicable, coating systems, surface preparation grades, dry film thickness and inspection requirements should be defined.

4. Quality Assurance and Inspection

Review the proposed quality control arrangements, material certification requirements, welding documentation and inspection scope.

Third-party inspections may involve additional costs depending on the inspection plan, location, witnessing requirements and contractual arrangements.

5. Engineering Responsibilities

Clarify whether the quotation includes shop drawings, connection detailing, connection design or other engineering services.

Manufacturing capability does not automatically imply responsibility for structural engineering design or project approval.

6. Packaging and Logistics

Compare export packing methods, container loading arrangements, shipping terms, delivery destinations and transportation responsibilities.

A quotation excluding international freight should not be directly compared with a quotation that includes shipping costs.

7. Commercial Terms

Evaluate payment conditions, quotation validity, production lead time, change-order procedures and applicable contractual requirements.

Preparing a Quotation Comparison Sheet

A practical quotation comparison sheet may include the following items:

  • Supplier name and quotation reference
  • Quotation date and validity period
  • Drawing revision and technical basis
  • Estimated or confirmed steel quantity
  • Structural steel unit price
  • Included and excluded components
  • Material grade and fabrication standards
  • Surface treatment requirements
  • Engineering and detailing responsibilities
  • Inspection and quality documentation
  • Export packaging
  • Delivery terms and destination
  • Production and delivery schedule
  • Payment terms
  • Technical deviations and commercial exclusions

Important consideration:

Before selecting a supplier, buyers should identify and clarify significant technical deviations, exclusions and commercial assumptions.

Where possible, suppliers should submit revised quotations based on the same confirmed scope of supply.

The objective is not simply to identify the lowest quoted price, but to understand the total cost, responsibilities and potential risks associated with each offer.


5. Commercial and Delivery Terms in Structural Steel Procurement

International structural steel procurement involves both manufacturing considerations and cross-border commercial arrangements.

Delivery terms, payment conditions, production schedules, shipping arrangements and contractual responsibilities should be clarified before placing an order.

Common International Delivery Terms

EXW — Ex Works

Under EXW, the seller makes the goods available at the agreed location, typically the manufacturing facility.

The buyer generally assumes responsibility for collection, loading where applicable, export arrangements, transportation and subsequent logistics.

The exact responsibilities should follow the agreed Incoterms rule and named place.

FOB — Free on Board

FOB is used for sea or inland waterway transport.

The seller is responsible for delivering the goods on board the vessel at the agreed port of shipment, subject to the applicable Incoterms provisions.

Buyers should clarify export customs clearance, port arrangements, loading responsibilities and the named port.

CIF — Cost, Insurance and Freight

Under CIF, the seller arranges and pays for the ocean freight and the required level of cargo insurance to the named destination port.

However, under Incoterms 2020, the risk normally transfers to the buyer when the goods are loaded on board the vessel at the port of shipment, rather than when they arrive at the destination.

Buyers should understand that paying for freight and insurance does not necessarily mean the seller carries the transport risk throughout the journey.

For containerized shipments handed over to a carrier before loading on board, other terms such as FCA or CIP may be more appropriate depending on the agreed logistics arrangements.

Important: The applicable Incoterms edition, named place or port, and any additional contractual obligations should be expressly stated in the purchase agreement.

Production and Delivery Schedule

Structural steel production schedules may depend on several factors:

  • Availability of approved manufacturing drawings
  • Material procurement and verification
  • Shop drawing review and technical clarification
  • Fabrication complexity and production capacity
  • Welding, inspection and quality documentation
  • Surface treatment and curing requirements
  • Export packing and loading arrangements
  • Vessel schedules and transportation availability

Buyers should distinguish between manufacturing lead time, readiness for shipment, shipment date and expected arrival date.

These milestones may represent different contractual obligations.

Payment Terms

Common international procurement arrangements may include:

  • Advance payment followed by balance payment before shipment
  • Payment against agreed shipping documents
  • Letter of Credit (L/C)
  • Other mutually agreed milestone payment arrangements

The suitability of each payment method depends on the contract value, buyer-supplier relationship, financial arrangements and agreed risk allocation.

Quotation Validity

Structural steel quotations normally have a defined validity period.

Changes in steel material prices, exchange rates, freight costs or technical specifications may affect the final commercial offer.

Buyers should confirm whether the quoted prices remain valid during the intended procurement decision period.

Important consideration:

Commercial terms should clearly define the agreed delivery obligations, payment milestones, ownership and risk arrangements where applicable, documentation requirements, and procedures for handling delays or changes.


6. Common Structural Steel RFQ Mistakes to Avoid

Even experienced procurement teams may encounter difficulties when structural steel RFQs do not clearly define project requirements.

The following mistakes can lead to inaccurate quotations, delays, disputes or unexpected additional costs.

Mistake 1: Sending Incomplete Drawings Without Identifying Assumptions

Preliminary drawings may be sufficient for an initial budget estimate, but suppliers should clearly understand which details remain unconfirmed.

Recommendation: Identify the drawing status, revision numbers, design responsibilities and assumptions used for preliminary pricing.

Mistake 2: Comparing Quotations with Different Supply Scopes

One manufacturer may include only primary structural steel, while another includes secondary steel, bolts, protective coatings and other components.

Recommendation: Prepare a consistent supply scope checklist and request suppliers to identify exclusions and deviations.

Mistake 3: Focusing Only on the Price per Ton

Unit prices may be calculated using different weight measurement methods or include different manufacturing operations.

Recommendation: Confirm the quantity basis, included components, unit definitions and final settlement method before comparing prices.

Mistake 4: Failing to Specify Applicable Standards

International projects may require particular material grades, fabrication standards, welding procedures, inspection requirements or local regulatory approvals.

Recommendation: Identify the applicable project standards and required documentation in the RFQ, and verify the manufacturer’s ability to satisfy them.

Mistake 5: Overlooking Engineering and Connection Responsibilities

Some manufacturers provide fabrication and shop drawings but do not undertake structural design or independent connection engineering.

Recommendation: Clearly allocate structural design, connection design, shop detailing, engineering review and approval responsibilities.

Mistake 6: Ignoring Surface Protection Requirements

Painting and galvanizing costs can vary significantly depending on the required specifications.

Recommendation: Specify the protective treatment system, applicable standards, coating requirements and inspection criteria.

Mistake 7: Underestimating Logistics and Delivery Costs

The manufacturing quotation may exclude international freight, destination handling, customs duties, taxes and local transportation.

Recommendation: Evaluate the estimated landed cost using the agreed delivery terms, shipping arrangements and destination requirements.

Mistake 8: Accepting Quotations Without Reviewing Exclusions

Important services or components may be excluded from a quotation even when they are necessary for the complete project.

Recommendation: Request a written clarification of inclusions, exclusions and technical deviations before placing an order.

Mistake 9: Ignoring Project Changes After Quotation

Structural design modifications, changes in material quantities and revised connection requirements may affect manufacturing costs and delivery schedules.

Recommendation: Establish a clear procedure for drawing revisions, variation orders and price adjustments.

Mistake 10: Selecting a Manufacturer Based Only on Price

The lowest quotation may not offer the most appropriate combination of technical capability, documentation, manufacturing quality, delivery reliability and commercial terms.

Recommendation: Consider the total procurement requirements and project-specific risks when evaluating potential manufacturing partners.


A Practical RFQ Review Checklist

Before sending a structural steel RFQ to potential manufacturers, buyers may use the following checklist.

Project and Engineering

  • Project location and building type have been identified.
  • Available structural drawings and their revision status are specified.
  • Preliminary or confirmed steel quantities are provided.
  • Applicable material and fabrication standards are identified.
  • Engineering and connection design responsibilities are clarified.

Manufacturing and Quality

  • Primary and secondary steel components are defined.
  • Bolts, connection plates and miscellaneous components are included or expressly excluded.
  • Welding and fabrication requirements are specified.
  • Surface treatment and corrosion protection requirements are identified.
  • Quality documents and third-party inspection expectations are clarified.

Commercial and Logistics

  • The quotation pricing method and weight basis are defined.
  • The scope of supply and exclusions are documented.
  • Export packaging and shipping requirements are identified.
  • Delivery terms and destination are stated.
  • Expected production and delivery schedules are communicated.
  • Payment terms and quotation validity are clarified.

A structured RFQ does not eliminate every procurement risk, but it helps reduce uncertainty and supports more transparent communication between buyers and potential suppliers.


Independent RFQ & Quotation Insights

SteelSourcing Compass is an independent structural steel sourcing information and industry networking platform.

We share practical procurement knowledge and explore sourcing opportunities to help international contractors, developers and project owners better understand China’s structural steel manufacturing supply chain.

SteelSourcing Compass is not a structural steel manufacturer, engineering design authority or certification body.

Any manufacturing quotation, engineering responsibility, compliance documentation or contractual commitment must be confirmed directly with the relevant service providers.

Our objective is to encourage clearer technical communication, better-defined procurement requirements and more informed sourcing decisions.